Guides / Standards
Heat, Noise and Vibration at Work: Limits and What the Building Changes
November 21, 2026
Workers in Vietnam are protected by national limits for noise, microclimate and vibration, and the employer must measure them. As a tenant you are the employer, so a hot or loud hall is your compliance issue, not the landlord’s. The building still decides how hard the problem is: a poorly insulated roof, few vents or a thin wall around a compressor make every later fix more expensive.
This guide is general information, not legal advice. Your occupational safety adviser or monitoring body confirms the limits for your work.
The regulations
All three workplace regulations were issued by the Ministry of Health in 2016. They set limits for exposure at the workplace and apply to employers and to the bodies that monitor them.
| Factor | Regulation | What it covers |
|---|---|---|
| Noise | QCVN 24:2016/BYT | Permitted noise exposure level at the workplace |
| Microclimate | QCVN 26:2016/BYT | Permitted temperature, humidity and air speed in the workplace |
| Vibration | QCVN 27:2016/BYT | Permitted vibration exposure of workers |
We did not find any 2025 or 2026 replacement for these three. The Ministry of Health has recently issued new workplace chemical and microorganism regulations, which we cover in our chemical exposure guide. Check with your adviser that the physical-factor limits have not changed when you start.
We do not quote numeric limits. The microclimate values differ with the physical load of the work, and the noise limit is set against the length of exposure. Ask your adviser to extract the rows for your jobs.
A trap in the numbering
Another regulation has a similar number but a different job. QCVN 26:2025/BNNMT, issued by the Ministry of Agriculture and Environment, is the national regulation on noise in the environment. It took effect on 14 November 2025 and replaced QCVN 26:2010/BTNMT. It deals with noise that reaches neighbours and the surroundings, not with worker exposure. You may meet it in the park rules or in your environmental file. Do not mix it up with QCVN 26:2016/BYT on microclimate.
You can read the environmental noise regulation on the government portal.
How it is checked
The Law on Occupational Safety and Hygiene requires an employer to arrange workplace environment monitoring at least once a year for harmful factors that have limits set by the Ministry of Health. A body that meets the legal conditions takes readings at the work points and issues a report. If a point exceeds a limit, the employer must find the cause, put in controls and keep records. Customer audits often ask for the latest report, so keep it ready. See our guide to audit requirements.
Measure once before fit-out, as well. The result shows what the building gives you. Do it in the hot season, when the problem is worst.
How the building affects heat
Heat comes from the sun on the roof, from process equipment, from people and from humid air. The building controls the first one and helps with the others.
- Roof. A single-skin metal roof in direct sun radiates heat on workers. Insulation or a sandwich panel cuts it. See the roof insulation guide.
- Vents. Ridge vents and low wall openings move air without power. Check that they are open and aligned. See ventilation and cooling.
- Clear height. A tall hall lets hot air rise above the workers.
- Walls. Light-coloured walls and shaded openings reduce heat gain.
- Process equipment. Ovens, furnaces and moulding machines need local extraction ducts through the roof or walls, which need the landlord’s consent.
How the building affects noise
- Hall volume and surfaces. Large, hard-surfaced halls echo. Acoustic panels or baffles help.
- Walls and roof. Thin sheet walls let noise out to neighbours and let neighbours’ noise in. A unit that shares a wall is harder. See standalone and shared buildings.
- Equipment rooms. A separate compressor room with masonry walls cuts noise at the source.
- Slab. Presses and heavy machines send vibration through the floor. A thick, undamaged slab helps, and machine mounts do the rest. See floor load.
- Outdoor equipment. Fans, chillers and generators sit close to the boundary. Check the distance to neighbours.
Noise also travels outward. Some parks and local offices set limits on noise at the plot boundary. Ask the park management what applies to your unit. It matters more where residential areas or workers’ housing lie close by.
Looking for a factory now? Send my requirements
Process guide
| Process | What to watch |
|---|---|
| Metal stamping and pressing | Noise at the machine and vibration in the slab |
| CNC and fabrication | Noise from cutting and compressed air, coolant mist |
| Plastic injection | Heat from moulds and dryers, chiller noise. See plastic injection |
| Garment and textile | Heat from large crews and many motors. See garment factories |
| Woodworking | Noise from saws and dust extraction fans |
| Food | Hot lines and cold rooms with hygiene rules that restrict open vents |
Questions for the landlord
- What is the roof made of, and is there insulation?
- Are the vents working and can we add more?
- Can we put exhaust ducts or fans through the roof and walls?
- Are there noise limits at the boundary from the park or the neighbours?
- Do you have monitoring reports from the last tenant?
- Who must restore the roof and walls at the end of the lease?
Write approvals into the lease and list the works in a side letter. The handback guide shows why.
A simple measurement plan
- Before fit-out. Take heat readings at several points at midday in the hot season and noise readings with the neighbours’ machines running.
- After machines are installed. Ask the monitoring body for a baseline survey at the work points, including the loudest machine and the hottest line.
- After controls. Add insulation, enclosures or fans where a point is close to a limit, and measure again.
- Every year. Keep the annual monitoring report, with the date, the points and the instrument calibration.
Keep these reports with the lease file. They help in an audit, in an insurance claim and in a talk with the landlord about roof or vent repairs.
People and habits
Controls on the building are half of it. Rest breaks in a cooler area, drinking water, hearing protection where needed, job rotation on the loudest machines and training all matter. The adviser can tell you which are required for your work. A hot hall that workers avoid also costs you hires, as our labour guide explains.
Common gaps and cheap fixes
| Gap | Cheap first step |
|---|---|
| Hot spot under an uninsulated roof | Insulation layer, reflective coating or roof sprays, with landlord consent |
| Closed ridge vents | Open and clean them, then add fans |
| Compressor in the main hall | Move it to a small room with a louvred door |
| Press vibration into the slab | Anti-vibration mounts and isolation pads |
| Echo in a large hall | Hanging baffles over the loudest areas |
| Noisy chiller at the boundary | Screens, a lower speed or a move to the far side of the plot |
| Workers near an oven | Local exhaust, heat shields and rest areas |
Cheap steps do not replace the monitoring report, but they usually bring a reading back under a limit and give you evidence to show the landlord.
Get a shortlist
Tell us your process, headcount and any temperature or noise limits, and we will note the roof, vents and neighbours at each unit we visit. Send your requirements and we reply within 24 business hours. Tenants pay nothing.
Frequently asked questions
Which regulations set workplace noise and heat limits in Vietnam?
QCVN 24:2016/BYT covers noise exposure at work, QCVN 26:2016/BYT covers microclimate (temperature, humidity and air speed) and QCVN 27:2016/BYT covers vibration. All were issued by the Ministry of Health. We found no replacement, but confirm the current text with your adviser.
Is QCVN 26:2025/BNNMT the workplace heat or noise rule?
No. QCVN 26:2025/BNNMT is the environmental noise regulation of the Ministry of Agriculture and Environment, for noise reaching surroundings. It took effect on 14 November 2025 and does not assess noise exposure of workers. The numbers look alike, so check the issuer.
Who measures noise and heat in a factory?
A qualified workplace environment monitoring body hired by the employer. The Law on Occupational Safety and Hygiene requires monitoring at least once a year for harmful factors that have national limits.
Can a tenant improve heat and noise in a rented factory?
Yes, in many cases. Roof insulation, vents, fans, enclosures and machine mounts help, but they need the landlord's consent when they touch the structure. Agree the works and the handback condition in writing.
Looking for a factory now?
Send your requirements. We reply within 24 business hours and shortlist up to 5 checked factories. No fee for tenants.
Send my requirements