Air Quality at Work: Chemical and Dust Limits and the Building You Lease

November 21, 2026

Employers in Vietnam must keep airborne chemicals and dust below national exposure limits and must measure them. For a tenant that means two jobs: find which limits apply to the substances in your process and make sure the building lets you control them at the source. Rules for the limits changed in 2025 and change again in April 2027, so check the date as well as the substance.

This guide is general information, not legal advice. An occupational safety adviser or a licensed monitoring body confirms the rules for your plant.

The regulations in 2026

The Ministry of Health has replaced the old 2002 hygiene standards in stages. Each new regulation lists substances with permitted exposure limits in mg/m³. They distinguish an 8-hour average from a short 15-minute limit.

Regulation Covers Status we found
QCVN 03:2019/BYT (Circular 10/2019/TT-BYT) 50 chemical factors Issued 2019. We found no repeal
QCVN 02:2019/BYT (Circular 02/2019/TT-BYT) Five types of dust Issued 2019. We found no repeal
QCVN 01:2025/BYT (Circular 09/2025/TT-BYT) 70 chemical factors Effective 1 October 2025
QCVN 31:2026/BYT (Circular 38/2026/TT-BYT) 80 chemical factors Issued 9 October 2026, effective 9 April 2027
QCVN 32:2026/BYT (Circular 39/2026/TT-BYT) Airborne microorganisms Issued 9 October 2026, effective 9 April 2027

The chemical lists seem to cover different substances. Circular 38/2026 says the chemical standards in that decision expire on 9 April 2027. We could not read the transition rules of each regulation in full, so ask your adviser to place every substance of yours in the right list and to state which version applies on your start date.

You can read the circular for the 80-substance regulation on the government portal.

What counts as a chemical factor in a factory

Think beyond the obvious chemicals. Airborne exposure comes from:

  • solvents in paint, adhesives, cleaning and inks
  • fumes from welding, soldering and brazing
  • mists from coolants and cutting oils
  • vapours from plastics processing and curing
  • acids, alkalis and plating chemicals
  • dust from wood, metal, ceramics, textile and powders
  • gases from heating, generators and forklifts

Your safety data sheets list the substances and their hazards. Give them to the adviser, together with the quantities used per shift and the layout of the work area.

What the employer must do

The regulations and the Law on Occupational Safety and Hygiene point to the same routine.

  1. Identify the harmful factors in each work area.
  2. Choose the monitoring parameters that fit your conditions and the hazards at each location.
  3. Monitor at least once a year through a body that meets the legal conditions. Its equipment must be calibrated, and it answers for the accuracy of its results.
  4. Act if readings exceed limits: find the cause, add controls and re-measure.
  5. Keep records and share the results with workers where required.

Customer audits and insurers ask for these reports. See our guide to factory audit requirements.

What the building must allow

Control at the source beats general ventilation. That needs physical changes, and a leased building limits them.

Control What it needs from the building Landlord question
Local exhaust at the process Ducts through the roof or wall, fan base, power May we cut openings in the roof or wall?
Make-up air Openings or fans to bring in fresh air Can we add intake louvres?
Filters and scrubbers Space, drainage and power for the unit Where can it stand outside?
Stack outlet Height above the roof and away from air intakes Are there height limits from the park?
Separated process rooms Walls, doors and negative pressure May we build partitions?
Chemical store A separate room with bunding and ventilation See chemical storage
Washing and eyewash points Water supply and drainage to pretreatment Where do the drains connect?
Explosion-safe equipment Electrical gear rated for the zone Does the fire approval cover this?

Some of these lines link to other rules. A solvent room raises the fire hazard class, as in our hazard class guide. Air emissions to the outside have their own standards, covered in the emission standard guide. Wash water and spent liquids go through the wastewater rules.

Looking for a factory now? Send my requirements

General ventilation still matters

After capture at the source, general ventilation dilutes what remains. Roof vents, wall openings and fans do this, as covered in our ventilation guide. Do not rely on it for toxic fumes. A large hall with open doors can still leave a worker at a fume source with a high exposure.

Questions to ask before you lease

  • Which substances will we use, and where do they appear in the Ministry of Health lists?
  • Does the building’s fire approval allow solvent or powder handling, and in which area?
  • Can we cut the roof or wall for ducts, and what does the landlord charge or require?
  • Do the park rules limit emissions, odour or stacks?
  • Is there a past monitoring report for the unit?
  • Who removes the ducts and fills the openings at the end of the lease?

Write the permission and the handback duty into the lease. See environmental permits for the permit side.

Process hints

Process Typical airborne issue
Welding and fabrication Metal fumes, ozone, noise
Painting and coating Solvent vapour, overspray
CNC machining Coolant mist, metal dust
Plastic injection Vapour from heated resins, dust from regrind
Woodworking Wood dust
Electronics Soldering fumes, cleaning solvents

A simple example

This is an example, not a case. A tenant plans metal fabrication with welding and a small powder-coating booth. The adviser lists welding fumes, coating powder dust and cleaning solvent as the main airborne factors, finds each one in the relevant Ministry of Health list and sets a monitoring plan for the welding bays and the booth. The building question follows: does the roof allow an exhaust duct from the booth, is there space outside for a filter unit and does the fire approval allow powder handling in that area? The landlord answers yes to the first, asks for a drawing for the second and says the approval covers storage but not coating. The tenant now knows what to settle before signing.

Records to keep

  • The list of substances, with safety data sheets
  • The monitoring plan and the yearly reports
  • Calibration certificates from the monitoring body
  • Maintenance logs for fans, filters and ducts
  • Training records for workers who handle chemicals

These records support audits, insurance and any labour inspection. They also help the next tenant in the unit, so a landlord may ask for copies at the end of the lease.

A note on dust

Dust has its own regulation, QCVN 02:2019/BYT, which sets limits for five types of dust. Woodworking, grinding, ceramics, textile and powder handling are the usual sources. Some dusts can also burn or explode in the right conditions. If you handle fine combustible dust, tell your fire consultant as well as your safety adviser, since the fire hazard class, the choice of electrical equipment and the design of the extraction system all depend on it. Dust collectors are often placed outside the hall, which means space on the plot and consent from the landlord.

Get a shortlist

Give us your process and the main chemicals you use, and we will check roof access, space for ducts and the fire approval at each unit we visit. Send your requirements and we reply within 24 business hours. Tenants pay nothing.

Frequently asked questions

Which regulations set chemical exposure limits at work in Vietnam?

The Ministry of Health issues them in lists by substance: QCVN 03:2019/BYT for 50 chemicals, QCVN 01:2025/BYT for 70 chemicals and QCVN 31:2026/BYT for 80 chemicals from 9 April 2027. QCVN 02:2019/BYT covers five types of dust. Your adviser finds which one lists each substance you use.

What happens to the old 2002 hygiene standards?

Circular 38/2026/TT-BYT says the chemical hygiene standards in Decision 3733/2002/QD-BYT expire on 9 April 2027, when QCVN 31:2026/BYT takes effect. Check any substance you use against the new lists before that date.

Who has to monitor the air in a leased factory?

The tenant, as employer. The Law on Occupational Safety and Hygiene requires monitoring at least once a year for harmful factors with national limits, done by a body that meets the legal conditions.

Does the landlord have to allow exhaust ducts and stacks?

Only if the lease says so. Ducts and stacks usually pass through the roof or walls, so they need consent and sometimes a permit. Agree this in writing before you sign, and ask the park about emission rules.